As the title says, blame the Tour De France (2014) for the lack of blogs over the last month. I finally caught up on all the recorded episodes last week so no excuse now for getting on with the various things I have on my plate at the moment.
My friend PK was able to document his experience and howtos for the Raspberry Pi and using JMRI v3.8, so I now have some reference material to possibly add to my original instructions. On the subject of the Pi, the latest incarnation the B+ was released recently and PK went and bought himself one. He showed me the little beasty and I was impressed. I was also very impressed with the case that came with it from Element 14. It was very well designed, and about the size of a cigarette pack. Very slim! So I went and bought myself one as well seeing I had one of the earlier release Bs from a couple of years ago. So something else to get on with!
In the month just gone very little modelling has happened. However I have bought the three decoders needed for my Class 108 DMU (1 x motive/lights and 2 x function only for light control). Yet to install. I did however run the motor unit in on DC.
A couple of weekends ago Lachlan helped me with the DAS modelling clay placement on the vertical surfaces of the tunnel coming into the Bray MPD side of the layout. PVA painted on the polystyrene, then placement of the rolled thin clay onto the PVA. Then a little water on a finger to rub the edges of the pieces of clay together. While the clay was still damp, I also scratched in some fine lines with a pin to give the impression of the drill holes where the rock had been excavated. The intent is to hopefully produce a dark gray stone tunnel and excavated wall once painted. I did the painting yesterday so I will have a look at how it has dried overnight to see if the colour is correct. Else I can always paint over it again. I am using acrylic artist paint.
So now I have the Pi/JMRI side of things to sort out, the Bray tunnel painting, Metcalfe buildings to put together, plastic building and track side structures kits to put together, train detection sensors to install so that JMRI can 'see' things, decoder installs for the Class 108, as well as getting back to the NSWGR 73 Class decoder install!
So many things to do. Glad I don't have a huge layout to worry about at the moment!
This Week's Review
1 week ago
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
