I was able to get a spare 30 minutes on Tuesday night to prove if a styrene cone could be made for the grass machine. I cut out a paper template and then transferred it to 0.5mm thick styrene. I thought thinner might crimp to easily and any thicker might not have folded. The 0.5mm (.020") worked a treat. I held the two edges together with some strip and some magic tape while the glue set. I tested it on Wednesday night. The Woodland Scenics static grass worked OK but clumped. On Sunday I used the Noch grass and it worked a lot better through the smaller aperture.
Saturday was Club day. I showed off the grass machine to a few of the guys and all were impressed. I finally returned the Noch GrasMaster to PK. Thanks for the extended loan! I also received by latest order from MB Klein via PK, which consisted of mostly electronics to start on the layout.
Some time was spent on Lachlan's layout Saturday arvo after the Club as I also received some stuff for his layout. We put some station crew and passengers on the station and placed grit around the platforms. Sunday afternoon I replaced the dodgy point on Lachlan's layout with a Peco medium radius. This changed the alignment of the siding slightly.
I was able to get around to the control panel for the Kensington Hill signal box. Another How-To will follow about how I designed this, but today's effort basically involved cutting down some perspex sheeting and contact gluing the transparency onto the perspex. Once this sets I can start the drilling of the switch placement holes and the LED indicator holes. Once these are in place I can then progress to wiring up the panel to the NCE mini-panel, the Digitrax DS64, the MRC accessory decoder, signals, lighting and off course the point-motors. Busy times ahead!
 |
| Photo of the control panel |