Yes my two weeks leave is at an end. Back to the asylum, oops meant grindstone tomorrow. It has been a busy two weeks sorting out a few of the items off the Things To Do List, as well as one or two unexpected problems to be sorted out. Most of the days were right royal stinkers with the summer heat and humidity as only Brissie can do at this time of year. The times I ventured into the shed to get tools it was like an oven! As a result not much train time, except for this afternoon when the weather was OK and I spent a few hours on Illavearf, which had been neglected of late. I measured and cut down some timber for the goods yard platform and livestock platform. I then scraped out the scatter that had been glued in sometime during 2012. I positioned the terrace houses and drilled the holes for the LED wires. Yet to connect these up as I am looking at connecting these to a PCB with PIC to provide some lighting effects.
Yesterday I had to repair the set of shelves I use for my hobby materials storage as the read panel warped in the heat and buckled out. Fortunately I had some thicker MDF offcuts that I glued into position. Much better.
Three of my purchases from two weeks ago were delivered during the week. The yard lamps, the street lamps and the SMD LEDs. All tested OK and feedback provided back through Ebay. Unfortunately at least two of the four yard lamps suffered some damage thanks to Australia Post and their infernal use of rubber bands around mail! A pox on them! Nothing serious that some glue won't fix.
I was all ready to get to the Club on Wednesday when Murphy raised his ugle mug! Tuesday night the missus comes to me and says "We have a water leak in the bathroom". Oh joy. On looking it was more like a high pressure spray coming from the flexi-pipe going to the vanity cold water tap. Gaffer tape was no good, so the water mains was turned off, and a plumber summoned Wednesday. He was prompt and decided to sort my problem out first so was at my home mid morning. After this the vacuum cleaner decides to play up so a potential shop for a new one to replace the twelve year old one was on the cards, but after researching a couple of the better ones, the missus was no nearer a decision on which one to buy, so she decided to park the decision for later. So by the time all of this was done, there was no time to venture to the Club. Typical!
No further progress with the Raspberry Pi this week as it was too hot in the downstairs part of the house where my study/hobby room is located (even with A/C upstairs, not much was coming down the internal staircase).
So this week with things back to normal, I might be able to start sorting things out. At least two model structures to knock up (mentioned above), investigate the SMD LEDs installation into the semaphore signal, and maybe back to the RPi.
This Week's Review
1 week ago




