Monday, September 27, 2010

A DRAW!!

Well THE SAINTS drew with THE PIES on Saturday arvo. Did not see that one coming! Well I will have to do it (drink beer, nibblies, etc) again this Saturday arvo (what are the common folk doing!?!)

As for getting in some shedtime, I did get to the shed but the missus had some other thoughts how I was to spend my time yesterday. By the time the chores and 'jobs without notice' had been done, it was to late to do anything.

Oh well, at least I was able to keep going with building the station (Friday and Sunday nights) which is my priority at the moment.

Friday, September 24, 2010

A new blog is born

Since the last blog entry I have been fairly busy but have still had some time to spend both on my layout and my son's layout. Kensington Hill on Illavearf is progressing with the scenery. I am pottering around with a Noch static grass machine to see what it can do. I think I have to do some more practicing as some of the grass isn't great. At nights I have been progressing with the construction of the station building. Still a way off yet. Then it will be the platform before anything else. Have to have somewhere for the trains to stop! If I get a chance this weekend, I will take some updated photos of Illavearf.


Now for the reason behind the blog title. Lachlan's layout is starting to take shape. The mountain/tunnel looks pretty good and it is yet to be sceniced. I have an order from MB Klein coming in from the States with a stack of Bachmann building kits that apparently are click fit, so I am hoping that Lachlan will be able to build these with a little help from Dad so that he gets a sense of satisfaction from building something himself. As such his layout has reached a point that I think I will write about it away from my Musings page which I am keeping for Illavearf and general musings. I came up with some names for the layout; Twin Peaks, Bear Lake, Beaver Lake, Bear Springs and Beaver Springs. Lachlan liked the last one and so the layout has been named. I have made a new blog, beaver-springs.blogspot.com, which has a link off from my 'Links of Interest'. So in due course I will upload some photos of his layout and blog about his layout from this site.


I am a tad peeved with MRRC as no word for two weeks now. I sent another email chasing them up. Then there is DCC Concepts. I am waiting on some LEDs from Richard, but still nothing. A chase up email has been sent without reply.


Well Saturday arvo is the AFL Grand Final, so more then likely I will be planted in front of the TV drinking beer, eating munchies, and barracking for St Kilda. Why the Saints? Well my team the Lions didn't perform well this year and as Collingwood is the other GF team I am in the ABC camp (Anyone But Collingwood!). So maybe Sunday will see some shed time, hopefully on both layouts.


GO THE SAINTS!

Sunday, September 12, 2010

Visitor from the south

This week I was able to get a few things done both on my layout and Lachlan's. I knocked off early Friday arvo to come home to get the mowing out of the way but this idea was knocked on its head after rain had bucketed down and soaked the yard. Well to the shed to spend some quality time with Lachlan finishing the plastering of his mountain. It actually came out pretty good. I must think of a name for his layout and start a blog for his layout seeing as though I see to be chatting about it more than my own lately! Why quality time? Well the club's AGM was going to be on Saturday arvo and he wouldn't see me for a few hours.

Craig (from ca55ino.blogspot.com fame) , a work colleague and clubmate popped over for the first time on his way to the club on Saturday morning after receiving an invite from me earlier in the morning to come over for a looksy of the layouts in my shed. Craig lives about 50km from me on the south side of Brisbane, so a visit from him is a momentous event!

I received my parcel of goodies from Scalerail in the UK on Friday. So some stuff (fences, signal box and water tower) to build and place on Illavearf's Kensington Hill side.

Gary from MRRC is apparently waiting for the new US distributor of ESU to settle in before asking about the dodgy EL Class decoder file.

Richard from DCC Concepts finally replied to the order for the LEDs for the 44 Class, as well as some green ones. These I am going to use for an idea I have for the Kensington Hill mimic board. These should hopefully arrive this week.

I also started the station for the Hill side. This is a Scalescenes freebie from a past Hornby magazine edition that I think will suit quite well. Once this is done the platform will be next. Once these are installed I will then have a better idea of the available space for the remainder of the village or station surrounds.

Until next time.

I will do a bit more scenicing of the Hill before posting some more photos.

Sunday, September 5, 2010

Happy Fathers' Day to all

Well my Fathers' Day weekend was fairly reasonable. I was able to continue with the scenery on Kensington Hill by planting some trees of different heights, try some Noch Wildgras for looks, and fix up a few small things.

An hour or so on Sunday morning I spent with Lachlan on starting the plastering of the mountain on his layout before cleaning up and heading off to the in-laws for lunch and a few drinkies!

More plastering will need to be done over the 'chux' foundations of the mountain on Lachlan's layout (still yet to come up with a suitable Alaskan oriented name).

Through the week I emailed DCC Concepts to order the LEDs for the 44 Class. I am still to hear from Richard about the order.

I also contacted MRRC about the EL Class Select decoder again. Gary advised that apparently ESU's distributor in the States was changing hands and he had to try contacting the new mob. Bodes well for a timely resolution!!

I also ordered some fencing and other items from Scalerail in the UK to improve the scenery on the Kensington Hill side of Illavearf. I will have to start scratchbuilding the station and platform so that the rest of the environs can be planned once the remaining 'real estate' is known. I know I have to also sort out a cattle/sheep loading yard and goods shed on the sidings. Well until next time, I hope all the Dad's had a nice day today.

Monday, August 30, 2010

Traction at last on Illavearf

I was fortunate on Sunday to finally get some traction (pardon the pun) on Illavearf after many months in limbo. I tackled Kensington Hill's scenery by scattering my ant dirt (see article written ages ago) over the brown painted hill. Left for a bit to dry and repeated it. Green scatter was next, followed by some lighter green with various 'flowers' colours for contrast as I am trying to model a Spring scene. Some dark green lichen followed around one of the edges of the backboard to break the rather harsh ground-sky horizon and to suggest bracken hedges around the farm that is to go up on the hill. I will continue this idea around the other two sides of the hill during the week. Also two lichen 'rock climbing bushes' placed either side of the tunnel to break up the rock scene. Still a way to go but finally looking as though something is happening. Some photos of the Hill.




I still have to place the railside fencing, farm track, road, farm house (if I decide to put one in), trees and sheep in.

On Lachlan's layout, I was able to spend about an hour or so on Saturday getting the supports in for the plastering of the mountain-tunnel. I was intending to do the plastering on Sunday but I was selfish and decided to undertake the above work on Illavearf.

No word from Marcus over the weekend so I think I will go ahead and get the LEDs from DCC Concepts anyway.

Friday, August 27, 2010

So near and yet so far away for completion

Sorry for the tardiness of this week's post, I was intending to do something earlier but the week got away from me! Well last week's success with the Select was a bit premature. Basically after wiring up the lights and going for a test run, I blew them up with too much voltage. I hadn't wired resistors between the decoder and the 1.5V incandescent bulbs. After reading the small print in the installation guide, I soon realised that 1.5V bulbs don't like 16V punching through them! A query out to the Yahoo Loksound forum was answered by Marcus Ammann, followed up by photos of his installation. These are a great reference source. By all accounts it looks as though I will now have to do a bit of customising of the lights on the 44 by replacing them with LEDs. At this point I am also wondering whether I also install the red/white marker light LEDs as well. Hopefully Marcus will reply to my email over the weekend on this matter. I can then place an order with DCC Concepts for the required LEDs. Looks like a few more weeks at the minimum before I have the 44 Class operational.

I chased up MRRC yesterday and they hadn't heard anything from ESU. Gary was going to make another phone call. So the EL Class is still in limbo. Probably the only thing I can with this project is to look at the wiring again with the purpose of reducing the amount of extraneous wire lengths present so that the shell will fit back on. Maybe this will be next week's activity while waiting for the 44 Class bits and pieces to arrive.

Unsure what this weekend will bring modelling wise. Hopefully a couple of hours somewhere, doing something!

Monday, August 16, 2010

Hoo-bloody-ray! Success with a Select

My main focus this week was to get the 44 Class Select decoder installed to at least the motor control stage to ensure wiring correctness. This was achieved late Friday night and successfully tested at the club on Saturday arvo. It was apparent very early that the Trainorama supplied speakers were tinny at the default decoder volume, so I had to adjust the overall volume to remove most of the tinniness. Unsure whether this is a characteristic for all of these manufacturer supplied speakers or only if a quality decoder such as the Select is installed. If I get feedback advising that the speakers should be exchanged, then I may have to look into swapping them out for Loksound speakers. I didn't connect up the lights at this point. So it looks like I will have to fiddle around with the sound CVs to get something that is fairly reasonable. My task this week will be to connect up the lights. I have been taking notes and photos as I go so that I can write up a How-To. Stay tuned for this to be published soon.

No further word yet from MRRC on the EL class decoder that I sent away.

On Lachlan's layout we did some more scenicing but didn't get too far into it. Illavearf once again missed out on my attention to it this weekend as I HAD to get some yard and house jobs done on Sunday.

I read my mate Mr Mackie's blog last night and he seems to have lost his mojo (motivation). Hopefully the comment I left perks him up?

Well finally a few positive things to write about this week.